Proposed : Norwood Lake Ditch
LAST UPDATED:
Mar 19, 2026
Communities:
Northfield Center
Project Contacts:
Chuck Hauber, PE
Design Consultant:
Palmer Engineering
Plan Year:
01-01-2028 - 12-03-2028
The project is located in Northfield Center Township and is a Preliminary Report for the Norwood Lake Ditch Petition in accordance with Ohio Revised Code Section 6131.
If accepted by the County Council for funding the project will investigate the need to replace over 1,100 feet of storm sewer, determine which properties benefit from the project, determine if a route for the sewer can be developed that does not cross private property, prepare a detailed construction plan and develop a detailed cost estimate for the proposed work.
Status:
Palmer Engineering is handling the preliminary design for this proposed project. Once the preliminary work is done, under the ditch petition statute, the project will then have to go back to County Council to get authorization for the final design.