Proposed : Vanderhoof Rd Bridge Replacement

LAST UPDATED:

Mar 12, 2024

Project Details

Communities:

New Franklin

Project Schedule

Plan Year:

01-01-2024 - 12-31-2024

This project includes replacement of the existing single-span reinforced concrete slab structure carrying Vanderhoof Road (CR 215) over a Branch of Tuscarawas River. The structure shall be replaced with a single span reinforced concrete slab with approach slab or 4-side precast box culvert. Work also includes rock channel protection, new embankment and full-depth pavement on/adjacent to structure, erosion protection, pavement marking, and minimal approach roadway work (resurfacing, drainage, guardrail, etc.) necessary to tie-in to existing. It is located just east of Van Buren Road in New Franklin. 

Status:

At this time there are no status updates.
Bridge construction is scheduled for 2024.

Graphical map of project site

Maintenance of Traffic:

To be determined in the design phase. 

Image of Vanderhoof over Tuscarawas River POV

Costs

Total:

To be determined.

Funding Sources:

To be determined.