Construction : NOW OPEN: Pressler Road Bridge over the South Fork of the Tuscarawas River Replacement Project

LAST UPDATED:

Dec 4, 2023

Project Details

Project ID:

113152

Communities:

Springfield Township

Project Contacts:

Chuck Hauber, PE, PS

Design Consultant:

ms consultants, inc.

Project Schedule

Plan Year:

04-01-2023 - 11-30-2023

Construction Starts:

Apr 1, 2023

Construction Finish:

Nov 30, 2023

This project will replace the poor condition, structurally deficient, load posted two-span concrete slab structure a new structure. Design is scheduled for 2021 and 2022 and construction is anticipated for 2023. 

Status:

**The bridge reopened to traffic on 12/8/23**

Black Horse Bridge is the contractor for this project. Construction on this project started on 8/24/2023. Since the demolition of the original structure, piles have been driven, footers were formed, beems were set, deck was poured, road was paved, and gooving was completed. Weather permiting, this project will be completed this spring once permanent stripping is completed. 

Location:

On Pressler Road approximately 0.2 miles south of Killian Road, in Springfield Township.

Graphical map of project site
Image of Pressler Road Bridge Pour One 11/30/2023

Image of Pressler Road Bridge Pour Two 11/30/2023 title=

Image of Pressler Road Bridge Beams title=

Image of Pressler Road Bridge Surface Photo title=

Image of Pressler Road Bridge Photo Side View title=

Costs

Project Development Cost:

197,358.00

Construction Cost:

TBD

Total:

$1,250,000

Funding Sources:

CEAO Local Bridge Replacement Program funds up $1,000,000.00 and Motor Vehicle and Gas Tax funds