Construction : Pressler Road Bridge over the South Fork of the Tuscarawas River Replacement Project
LAST UPDATED:
Oct 5, 2023
Project Details
Project ID:
113152
Communities:
Springfield Township
Project Contacts:
Chuck Hauber, PE, PS
Design Consultant:
ms consultants, inc.
Project Schedule
Plan Year:
04-01-2023 - 11-30-2023
Construction Starts:
Apr 1, 2023
Construction Finish:
Nov 30, 2023
This project will replace the poor condition, structurally deficient, load posted two-span concrete slab structure a new structure. Design is scheduled for 2021 and 2022 and construction is anticipated for 2023.
Status:
Black Horse Bridge is the contractor for this project. Construction on this project started on 8/24/2023. Since the demolition of the original structure, piles have been driven and have started forming for the footers. The pouring of abutments is to begin Friday 10/06/2023.
Location:
On Pressler Road approximately 0.2 miles south of Killian Road, in Springfield Township.