Design : Intersection Improvement: Cleveland-Massillon Road at Ridgewood Road

LAST UPDATED:

Mar 5, 2020

Project Details

Project ID:

108131

Communities:

Copley Township

Project Contacts:

Tim Boley, PE, Highway/Drainage Engineering Section Manager

Design Consultant:

Thrasher Engineering

Project Schedule

Plan Year:

06-15-2020 - 12-31-2020

This project will improve the intersection of Cleveland Massillon Road at the western leg of Ridgewood Road on the border between Copley Township and the City of Fairlawn. 

The proposed improvement will:

  • Provide a new south bound right turn lane on Cleveland Massillon Road from the Rothrock Circle intersection to Ridgewood Road, 
  • Provide a new east bound left turn lane on Ridgewood Road at the intersection and extending 400 feet to the west.
  • Require the acquisition (donation) of land from the Copley School District to accommodate the new turn lanes,
  • Reconstruct the existing traffic signal installation, including new signal supports, 
  • Modify the existing storm water collection basin near the intersection.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.

Status:

Bids are in. Cook Paving and Construction Co. is the lowest bidder and the contract is in the approval process. Construction is expected in Summer of 2020. 

Graphical map of project site
Image of Cleve Mass at Ridgewood Project Image

Costs

Project Development Cost:

165,428.00

Construction Cost:

396,697.40

Funding Sources:

Federal Congestion Mitigation Air Quality Funds: $280,000.00

Copley Township: $100,000.00

Motor Vehicle and Gast Tax fund: $182,125.40